Comparison of FANLESS Cooling Tower with FAN Operated cooling tower:
 
PARTICULARS ‘MATANGI’ FANLESS COOLING TOWER FAN OPERATED COOLING TOWER

Design To work outevaporation required and quantity of air required for this evaporation Same
Air draft Created with nozzles. Numbers of nozzles are worked out. Created with fan. Size of fan is worked out.
Evaporation losses Will depend on wet bulb temp. and delta ‘T’ Will depend on wet bulb temp. and delta ‘T’
Drift losses Controlled by overlapping louvers Drift eliminators used, consumes more power
Approach   Up to 3-4 0 C   Steady all the time. Can be less than 3 o C. Increases as fills breaks and chokes
Range Can be designed as per requirement or higher range two towers in series to be installed Can be designed as per requirement For higher range two towers in series to be installed
Capacity (Flow rate) Can be designed for any capacity. Higher capacity to be split in two or more Numbers of modules. Can be designed for any capacity. For higher capacity to be split in two or more numbers of cells
Maintenance No moving parts   No breakdown maintenance   No stoppage of cooling tower so long as circulation pump is running Possibility of breakdown of bearings, fan, gear, motor, fills, etc. Cooling tower to be stopped for repairing Breakdown and maintenance can’t be avoided.
Spare parts No spares required   few nozzles can be kept Nozzles can be changed without stopping cooling tower. Require spares for drive and fills Have to depend on supplier  
Stand by cooling tower Even for continuous operation stand by cooling tower not required For continuous operation stand by cooling tower is required to take care against breakdown
Cost and investment Initial cost is less. No investment for stand by cooling tower. Thus two ways saving in investment. Higher initial cost.

Cost of stand by cooling tower. So added initial investment.

Power consumption No power consumption. Equivalent power available for other critical process equipment Power is a must at the cost of other critical process equipment.
Payback period No power consumption. No power bill. Payback period is almost one year. No payback period On the contrary there is running expense on power bill
Power failure In case of power failure only circulation pump is to be run on D G. In case of power failure D G is to be unnecessarily loaded for fan motor.
 
 
 
 
   